Portal de Torre Pacheco

www.portaldetorrepacheco.com

Torre Pacheco - SpanishTorre Pacheco - English
detail of Torre Pacheco

 

The City of Torre Pacheco inaugurates several works in Torre Pacheco and Roldán (26/01/2017)

Several accesses have been improved in Torre Pacheco to promote mobility and accessibility, works very demanded by the neighbors.

In the Industrial Park of Estrella, a road has been opened in front of the RM-F14 road, favoring access for users and owners of the ships along the road, avoiding a cumbersome route to reach the same place.

The amount of the work amounts to € 11,632

Another access that has been improved is the access to the Virgen del Pasico teaching center, located at the intersection of the RM-F21 road with Av. Maria Alicia Dominguez, where it was not allowed to turn left to access the teaching center.

To correct this deficiency a central lane of waiting has been realized to be able to rotate, facilitating the visibility and has cut off one end of the existing parterre.

This way the circulation lane of the Road RM-F21 is not altered, allowing to accelerate the traffic in that zone and avoiding possible accidents.

The amount of the work amounts to € 5,865.49

In the hamlet of Roldan have repaired the sidewalks of Murillo Street and Julian Romea.

The trees in the street Julian Romea had raised the steely so the corns and slabs have been repaired in poor condition, being passable for the neighbors.

They have also secured the edges of the sidewalks with a small wall to prevent fracturing of the sidewalks by erosion suffered by the slopes.

The amount of the work amounts to € 17,728.73

Source: Ayuntamiento de Torre Pacheco

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información